Project Overview
Project Name:
HDD Method Pipeline-Budugumpa Cross
Client :
Karnataka Govt
Year :
2021-22
Location :
Gangavathi Taluk, Koppal District
HDD Method Pipeline-Budugumpa Cross
The project involved the installation of a pipeline using the Horizontal Directional Drilling (HDD) method, enabling underground pipeline laying without open-cut excavation. This technique was chosen to: Minimize environmental and surface disruption. Safely cross roads, rivers, and sensitive zones. Ensure precision alignment for long-distance underground utility installation.
Post-Construction Evaluation
